P1 Fwd Control Column Stop Complete

The P1 fwd control column stop is now permanently installed and painted with P2 to follow next week. The 2 bare metal channels attached to the box are the first parts of the rudder pedal footrests, 4 to make. 95% certain of the construction of these based on photos looking down from above and upwards from the Bomb Aimers compartment. The latter are always in shadow and it’s hard to define what’s there but we’re pretty much on top of the design now.