Stirling stringer material

A major step forward for the Project has seen us take delivery of approx 300′ of stringer material (which is about half of the final total of this type needed), this is with great thanks to Teversham Engineering Ltd in Cambridge especially David Allsopp and Steve Grantham) who have kindly formed the material provided by us free of charge. The remaining 300′ plus 150′ of ‘z’ profile stringer is currently being worked on by them.

Additionally, the Project is hoping to move into new premises in the next few weeks which will hopefully allow us to have some much needed stability, next step the laying down of the bomb bay jig